[Case Study] Sysmex Corporation
Collaboration between drawings significantly reduces inspection work and rework due to mistakes!
We have introduced our electrical control cable design system "E3.series" to Sysmex Corporation, a manufacturer that consistently handles everything from research and development of the equipment, reagents, and software necessary for sample testing to production, sales, and service & support. Before the introduction, there were many tasks reliant on manual labor, and it took 7 weeks to design the entire wiring code, which posed challenges. With the introduction of "E3.series," we were able to automatically expand from the overall wiring diagram to the cable wiring diagram, improving work efficiency from 7 weeks to 3.5 weeks. [Challenges Before Introduction] ■ Many tasks relied on manual labor, taking 7 weeks to design the entire wiring code. ■ There were instances of quality issues due to missed responses during design changes. ■ Information transfer to the PDM was done manually, leading to mistakes and omissions. *For more details, please refer to the PDF document or feel free to contact us.
- Company:図研 本社・中央研究所
- Price:Other